Home > Exhibition > Content

3 kinds of force transmission methods and friction of mobile tower

May 10, 2019

When the mobile tower is in use, the force is transmitted by the friction of the contact surface, that is, the frictional reaction force after the contact surface of the joint is pressed to support the crossbar load and transmit it to the pole, such as the action of the fastener, through the tightening The positive pressure of the bolt creates friction.

 

The mobile scaffolding is transmitted by the weld. Most of the cross-bar and the pole are connected in this way. The gantry also belongs to this way, directly bearing the force. This method is more common in the scaffolding where the crossbar rests on the top of the pole.

 

The mobile scaffold is supported by the pin. That is, the pin is passed through the vertical coupling plate of the cross bar and the hole of the vertical rod to realize the coupling, and the pin is subjected to the shearing force on both sides.

 

3 kinds of force transmission methods for moving scaffolding

 

(1) The bearing force of the socket butt joint. That is, the upper and lower vertical bars are butted, and a connecting rod or a socket is used to ensure a good state of docking;

 

(2) The pin shear transmission force of the pin connecting pin;

 

(3) Engagement force of the screw connection. That is, the external thread of the inner tube meshes with the internal thread of the outer tube. The latter two types of force transmission are mostly used to adjust the height requirements of the pole connection.

 

https://www.aluscaffold.com/