Aluminium Foldable Ladder

Aluminum foldable scaffolding features: 1. Easy to load, unload and build. Apart from a single set for independent use, it can also form a large structure for escalators, stairs, construction sites, etc 2. Aluminum alloy material is lighter and stronger 3. Vertical climbing frame increases...

Product Details

Features:

1. Aluminum foldable scaffolding easy to load, unload and build. Apart from a single set for independent use, it can also form a large structure for escalators, stairs, construction sites, etc

2. Aluminum alloy material is lighter and stronger

3. Vertical climbing frame increases working space and reduces construction time

4. The platform can be built at different height of the aluminum frame as required

5. Multiple accessories are available to meet different engineering needs

image001.jpgimage002.jpg


Specifications:

Material:6061-T6

Width:1350mm

Main Tube:50.8*2mm

Thickness:2mm

Platform height:2~2.5m

Loading capacity:200KG/m2

Color:solid or customized


Company:

Rapid Aluminum Co.,Ltd. is a leading aluminum scaffold Manufacturer in China since 2009 which mainly engaged in the development and production of aluminum scaffoldings, namely aluminum tower, aluminum truss, aluminum ladder and plank, aluminum frame, special aluminum alloy profiles and other products.

 6S管理

FAQ:

Q:What can you get from us?

A:Since we are direct manufactory for Scaffolding System, you can be assured that we can offer good quality with good price. We believe that Whole-hearted production,credit business,continuous improvement,sincere service.

We provide OEM ODM and customized design services.

Q: What's your packing methods?

A: Our normal package is steel strip. We can also do package according to your request.

Q: Are you manufacturer or trader?

A: We are the munafacturer of scaffolding matetials for years, coveraged every scaffolding systems.

Q:.How long is the delivery time?

A:15-20 days after payment, but it also depends on the quantity. If your quantity is large enough, it is about 30-40 days.

factory1

 


Inquiry